Goldwind Completes First Wind Turbine Installation in Philippines Project

The ChangeGoldwind completes first wind turbine installation in the Philippines for the 100.8 MW Kalayaan 2 Wind Farm, expected to reach COD in 2026.

Mar 11, 2026
Indexed Mar 19, 2026
2 min read
DiscoveryGoldwind LinkedInOriginallinkedin.com
The Change

Goldwind completes first wind turbine installation in the Philippines for the 100.8 MW Kalayaan 2 Wind Farm, expected to reach COD in 2026.

Why It Matters

This deployment signifies Goldwind's successful entry and operational commencement in the Philippines, a key market in Southeast Asia's growing renewable energy sector. The 100.8 MW project, utilizing advanced GW165-6.0 MW turbines, contributes to the region's clean energy transition and demonstrates Goldwind's capability to execute large-scale wind power projects in new international territories, bolstering its APAC presence and offering sustainable energy solutions.

Key Takeaways
1

Goldwind completed the first wind turbine installation in the Philippines.

2

The Kalayaan 2 Wind Farm project has a capacity of 100.8 MW.

3

Full completion and COD are expected within 2026.

Regional Angle

This milestone marks Goldwind's first project in the Philippines, a strategic move into the Southeast Asian renewable energy market. The 100.8 MW capacity and use of advanced turbines highlight the region's increasing adoption of wind power and Goldwind's expanding footprint in APAC.

What to Watch
1

Full completion and COD are expected within 2026.

2

Goldwind completed the first wind turbine installation in the Philippines.

Based on official company source. SigFact extracts and structures signals from verified corporate announcements.
LinkedInX

Sign in to save notes on signals.

Sign In